Finished projects and services carried out by Tyrone Formwork
- Projects
Tyrone Formwork completed the construction of over 2.2km linear metres of RC ground beam and pile caps. We undertook this project that required a lot of planning due to the logistics and the scale.
6 Photos
Tyrone Formwork completed 2 machine bases within Bombardier's Belfast factory. The project had a strict programme that had to be met and TFW completed the project on time and on budget.
10 Photos
Tyrone Formwork completed the Bonham Quay project in the harbour area of Galway City, Ireland. The prestigious office development included a large basement car park and two 8 story office block. The office block included over 17,000m2 of soffit.
17 Photos
Tyrone Formwork completed the RC frame works on the Bromely Primary School project in London.
4 Photos
Tyrone Formwork completed the Twinbrook Leisure Centre project in Belfast for Heron Bros. The project included a 25m swimming pool which the wall pours and waterproofing are critical. We worked closely with the structural engineers and main contractor to ensure the best pour layout, size and design.
9 Photos
Tyrone Formwork completed the City Quays 3 project in Belfast. The project included a 1750mm deep raft slab with over 3000m3 of concrete and a 68m high slipformed core structure with over 2000m3 of concrete. The core walls where completed within the 7 week programme.
18 Photos
Tyrone Formwork completed all RC works for Wilmott Dixon on the leisure centre project in Bishop's Stortford, Essex. The project included the construction of 3 swimming pools of various sizes and these were delivered on programme.
14 Photos
Tyrone Formwork completed the RC works for the South Lake Leisure Centre project in Craigavon, Armagh. The project included 3 swimming pools of various sizes and required a lot of planning within the formwork design element of the project as the walls had to be poured with the RC slab.
27 Photos
Tyrone Formwork completed the full RC frame for Kier Group in Woodford, London. The school included a 4 story 3900m2 frame.
16 Photos
Tyrone Formwork completed the full RC works for SRC Group in their Quarry in Essex, London. The full RC slab, yard and large walls are required to house the large quarry plant. All parts of the project required a eye for detail and low tolerances as the plant is fabricated off site and installed when RC works are complete.
10 Photos
Tyrone Formwork completed the RC substructure works package for John Sisk in the Wuxi Pharmaceutical site in Dundalk, Ireland. The project covered a large area of substructure works for an extension to the current steel frame buildings on site. We worked closely with John Sisk to meet the high standards of both quality and health & safety required on site.
9 Photos
Tyrone Formwork completed the redevelopment works on Altnaglevin Hospital in Derry for Farrans Construction. The project included large drop beams within all soffits and impressive feature columns for the entrance of the hospital.
13 Photos

Tyrone Formwork – Ireland HQ
167 Washingbay Road, Dungannon
Co. Tyrone, BT71 5EQ
Tyrone Formwork – UK
Grove Farm, Brook Street, Brentwood
England, CM18 6BB

Contact Us


Careers



Project Query
Leave us a message using the form below and we will get back to you as soon as we possibly can.